One close model
Five departmental files landed in one structured workbook.
Excel case study
Dummy manufacturer: a three-day close became a same-week pack their analysts still run.
Five plants emailed CSV files. A finance owner pasted them into a master workbook over a long weekend. Links broke when a sheet was renamed. The board pack slipped whenever one plant was late.
The dummy result: close time moved from three days to about six hours. They stopped paying Saturday overtime and stopped a second contractor who only existed to repair broken links after each close.
Excel services: one structured close model, named input tables per plant, and variance checks before the pack went out. Documentation showed where to add a new entity. The team still runs the file a year later.
What you get
Sample delivery list for a close-rebuild story.
Five departmental files landed in one structured workbook.
Each owner updates a table, not a hidden range.
Dummy rules flag a missing cost centre before the pack goes out.
P&L, cash, and commentary the MD already expected.
Where to add a new entity without breaking the consolidate.
Two close cycles of fixes after go-live.
Why this engagement
Dummy finance pain points — edit to match a real close.
Dummy plants emailed CSVs that someone pasted by hand.
The close owner worked Saturday whenever a plant was late.
A renamed sheet killed the board pack twice in a quarter.
Nobody knew which tab was source of truth.
They needed a trail, not another hero spreadsheet.
The rebuild had to be something two analysts could run.
How we work
Written plan first. Working files every week.
Mapped the outcome, sources, and who would own the file after handover.
A written plan, timeline, and price before any build started.
Short sprints with working files the client could review weekly.
Real close / reporting scenarios with the people who run the process.
Documentation, a walkthrough, and access their team kept.
A defined window for fixes as the data or team changed.
Client stories
Month-end dropped from three days to a few hours. The model is still running without them.
Five people can update it without breaking formulas.
Handover our analysts used on day one.
Help centre
Yes. Replace names and timings in WP Admin before you share it.
The matching service page is /services/excel/. This page is the story format.
Most close work in our dummy timeline is 2–4 weeks after a written brief.
In a real engagement the client owns the file. This sample assumes the same.
Describe the pack. We will say if a rebuild, a macro, or training is the right next step.
Contact us