Excel case study

Month-end close rebuilt in Excel

Dummy manufacturer: a three-day close became a same-week pack their analysts still run.

3 days → 6 hrs Close time
5 → 1 Workbooks merged
3 weeks Sprint length
12 months Still running

The story

What the client was facing

Five plants emailed CSV files. A finance owner pasted them into a master workbook over a long weekend. Links broke when a sheet was renamed. The board pack slipped whenever one plant was late.

How our services saved time and cost

The dummy result: close time moved from three days to about six hours. They stopped paying Saturday overtime and stopped a second contractor who only existed to repair broken links after each close.

How we automated the process

Excel services: one structured close model, named input tables per plant, and variance checks before the pack went out. Documentation showed where to add a new entity. The team still runs the file a year later.

What you get

What we delivered

Sample delivery list for a close-rebuild story.

One close model

Five departmental files landed in one structured workbook.

Named inputs

Each owner updates a table, not a hidden range.

Variance checks

Dummy rules flag a missing cost centre before the pack goes out.

Pack tabs

P&L, cash, and commentary the MD already expected.

Handover notes

Where to add a new entity without breaking the consolidate.

Support window

Two close cycles of fixes after go-live.

Why this engagement

The challenge

Dummy finance pain points — edit to match a real close.

Five files, one email

Dummy plants emailed CSVs that someone pasted by hand.

Weekend overtime

The close owner worked Saturday whenever a plant was late.

Broken links

A renamed sheet killed the board pack twice in a quarter.

No owner map

Nobody knew which tab was source of truth.

Audit questions

They needed a trail, not another hero spreadsheet.

Team of two

The rebuild had to be something two analysts could run.

How we work

How the engagement ran

Written plan first. Working files every week.

Discover

Mapped the outcome, sources, and who would own the file after handover.

Propose

A written plan, timeline, and price before any build started.

Build

Short sprints with working files the client could review weekly.

Test

Real close / reporting scenarios with the people who run the process.

Handover

Documentation, a walkthrough, and access their team kept.

Support

A defined window for fixes as the data or team changed.

Client stories

What clients say

Month-end dropped from three days to a few hours. The model is still running without them.

Neha Kapoor Sample — Finance Director

Five people can update it without breaking formulas.

Rohit Malhotra Sample — Operations

Handover our analysts used on day one.

Laura Chen Sample — FP&A

Help centre

Frequently Asked Questions

Is this dummy data?

Yes. Replace names and timings in WP Admin before you share it.

Could this be a live Excel service?

The matching service page is /services/excel/. This page is the story format.

How long would a real rebuild take?

Most close work in our dummy timeline is 2–4 weeks after a written brief.

Do you keep a copy?

In a real engagement the client owns the file. This sample assumes the same.

Have a close that still lives in five inboxes?

Describe the pack. We will say if a rebuild, a macro, or training is the right next step.

Contact us